More
About infrastructure

FACILITY BRIEF

  • The Facility is spread over an area of 20 Acres and has 4 Manufacturing Blocks.
  • Hormone Block for Softgelatin Capsules and Tablets.
  • Cephalosporin Block comprises of a dedicated section for Dry Powder Injectable, Dry Syrup, Suspension, Tablets, Capsules & Drops.
  • Liquid Injectable Block for Liquid Injectable in Ampoule and Vial with Lypholization.
  • Oral Solid Dosage Block for manufacture of Tablets and Capsules in General category.
  • Well equipped Warehouse for RM,PPM, SPM & FG with controlled Temperature & Humidity.
  • Separate Utility Block to take care of all formulation unit and proposed future expansion.
  • Dedicated QA/QC to handle Incoming, In-process and finished goods with independent Microbiology section.
  • Well designed HVAC for different formulation facilities as per c-GMP guidelines.
  • In-house R & D Setup for Product Development.
  • Regulatory support and compliance
  • Independent Water system which provides USP grade Purified Water & Water For Injection.

back to top


CAPACITIES

Sr. no Manufacturing section formulation units in million
per shift
( 8 hr )
per annum
( 300 days)
01 Hormone Softgel Capsule 0.77 231.00
    Tablet 1.10 330.00
02 Cephalosporin
Tablet 2.20 660.90
    Capsule 1.84 552.00
    Dry Syrup 0.02 006.00
    D.P. Injectable 0.05 015.00
03 Liquid Injectable Ampoule 0.096 14.40
    Vial 0.096 14.40
    Vial 0.072 21.60
04 Oral Solid Dosage Tablets 2.15 650.00
    Capsules 0.80 240.00


back to top

MAJOR MACHINERY

  • Liquid Injectable Combi Line from ROTA, Germany.
  • Capsule filling Machines from SEJONG, Korea.
  • Dry Syrup filling from DOSA, Italy
  • Water System from ‘Christ- Nishotech’
  • All Process Equipment and Packing machineries from Reputed Indian & European Manufacturers.


back to top

QA / QC

  • U.S. & E.U. Compliant Laboratory.
  • Separate Facility for Sterility and Micro analysis.
  • World class Instruments to handle In-coming, In-process and Finished Goods.
  • Qualification Documents for all key equipment
  • Validation as per defined Protocol.
  • Environment Monitoring programme for all manufacturing sections.


back to top